How many phases does ADM include?

ten Phases
The Architecture Development Method (ADM) has ten Phases, as identified here. The approach and complete description of each Phase are provided in the TOGAF documentation available on The Open Group website, to identify the objectives, inputs, steps and outputs of each phase.

In which phase of the Togaf ADM is the focus the creation of an implementation and migration plan in co operation with the portfolio and project managers?

The focus of Phase F is the creation of an Implementation and Migration Plan in co-operation with the project and portfolio managers.

What is an objective of the ADM preliminary phase?

The main objectives of the Preliminary Phase are to determine and establish the Architecture Capability desired by the organization. A key part of this is to define what needs to be done, and how it will be carried out.

What is the ADM in Togaf?

The TOGAF Architecture Development Method (ADM) forms the core of TOGAF. It is a reliable, proven method for developing an IT architecture that meets the business needs of an organization, utilizing the other elements of TOGAF described in this document, and other architectural assets available to the organization.

What are the five main focus areas of ADM?

This chapter describes the Architecture Development Method (ADM) cycle, adapting the ADM, architecture scope, and architecture integration.

  • 5.1 ADM Overview.
  • 5.2 Architecture Development Cycle.
  • 5.3 Adapting the ADM.
  • 5.4 Architecture Governance.
  • 5.5 Scoping the Architecture.
  • 5.6 Architecture Integration.
  • 5.7 Summary.

How does ADM align to new?

The ADM is iterative over the whole process, between phases and within phases; for each iteration of the ADM, a fresh decision must be taken on: The breadth of coverage of the enterprise to be defined. The level of detail to be defined. Assets created in previous iterations of the ADM cycle within the enterprise.

What phase are architect contracts prepared?

The Statement of Architecture Work is created as a deliverable of Phase A, and is effectively an Architecture Contract between the architecting organization and the sponsor of the enterprise architecture (or the IT governance function, on behalf of the enterprise).

Are a good way of assessing the ability of an enterprise to exercise different capabilities?

Capability Maturity Models (detailed in Part VI, 45. Architecture Maturity Models) are useful ways of assessing the ability of an enterprise to exercise different capabilities. Capability Maturity Models typically identify selected factors that are required to exercise a capability.

What do you call the documents that are produced in each phase of the ADM?

Throughout these phases, documents called deliverables are produced, updated, and reviewed and then stored in the architecture landscape.

What is the purpose of the preliminary phase?

The key objective of the Preliminary Phase is to establish the Architecture Capability for the enterprise. In practical terms this activity will require the establishment of a number of architecture partitions, providing defined boundaries, governance, and ownership.

What is ADM process?

Introduction. Aeronautical decision-making (ADM) is decision-making in a unique environment—aviation. It is a systematic approach to the mental process used by pilots to consistently determine the best course of action in response to a given set of circumstances.

What does ADM align to the new?

Answer: In addition, ADM will develop water reduction plans for high-risk and water-scarce areas. The company said the new targets align with the United Nations Sustainable Development Goals, and will be achieved through reusing and recycling water, and finding alternative uses for waste.

What is the preliminary phase of the TOGAF standard?

The TOGAF ADM is a generic method, intended to be used by a wide variety of different enterprises, and in conjunction with a wide variety of other architecture frameworks, if required. The Preliminary Phase therefore involves doing any necessary work to initiate and adapt the ADM to define an organization-specific framework.

How is the TOGAF Architecture Development Method ( ADM ) used?

The TOGAF Architecture Development Method (ADM) is a generic method, intended to be used by enterprises in a wide variety of industry types and geographies. It is also designed for use with a wide variety of other enterprise architecture frameworks, if required (although it can be used perfectly well in its own right, without adaptation).

When to return to the preliminary phase of the ADM?

The Preliminary Phase may be revisited, from the Architecture Vision phase (see Part III, 19. Applying Iteration to the ADM ), in order to ensure that the organization’s Architecture Capability is suitable to address a specific architecture problem.

What are the deliverables in TOGAF ADM tutorial?

TOGAF provides a number of input and output deliverables from each phases: These are suggestions and need not be followed exactly Each deliverable produced should be versioned to indicate when a change has occurred The version numbering shown is also a suggestion and need not be followed